Permit Drawings Explained: What They Are and What Ottawa Wants

By HMJ Contracting · Ottawa, ON

Residential permit drawings spread across a worktable

Permit drawings are the scaled plans you submit with a building permit application so the city can check that your project is safe and meets the Ontario Building Code and the zoning rules. They are not the same as the detailed set your crew builds from, and the gap between the two is where many first-time renovators lose weeks. At HMJ Contracting we manage permits for renovation, demolition and deck projects in the Ottawa area, so this guide walks through what the drawings contain, who can prepare them and how to get them right the first time.

Hmjcontracting
Plan Safer Renovations in Older Homes
HMJ Contracting provides certified asbestos, lead and mold abatement for Ottawa homeowners planning renovation or demolition work.
Visit

TL;DR

  • Permit drawings show the city what you plan to build: site plan, floor plans, elevations, sections and the structural and mechanical information that applies to your project.
  • Construction drawings carry the extra dimensions and details that trades need on site. A permit set is often the minimum, not the full build package.
  • In Ontario, an owner can draw plans for their own house in many cases. Otherwise a qualified designer with a BCIN, an architect or an engineer must sign the Schedule 1 form.
  • Ottawa requires digital, scaled and fully dimensioned drawings. What you must submit depends on the project type.
  • If your older home may contain asbestos, vermiculite, lead paint or mould, plan the abatement and demolition scope before the drawings are finalized.

Table of Contents

What permit drawings are

A building permit is the municipality’s approval to start construction. To grant it, the building department has to see the work on paper. The City of Mississauga explains that it requires drawings of a proposal so it can determine whether the building is safe and complies with the Zoning By-law, the Ontario Building Code and other applicable law. The same page says the drawings must be drawn correctly and professionally and include construction details such as materials, sizes, spans and dimensions.

In plain terms, a permit set answers three questions for a plans examiner:

  1. Where is it going? (the lot, setbacks, property lines)
  2. What is it? (rooms, openings, stairs, structure, materials)
  3. Does it meet the code? (fire safety, structure, exits, energy efficiency, plumbing and heating design)

A reviewer who has never seen your house should be able to follow the plans. Saskatoon’s published requirements put it this way: plans must show all intended work in enough detail that a person unfamiliar with the project could follow them for construction. Ottawa applies the same logic.

What a residential permit set contains in Ottawa

For houses, additions, renovations and accessory structures under Part 9 of the Building Code (the part that covers smaller buildings), the City of Ottawa asks for a signed digital application, a complete set of digital scaled construction drawings that are fully dimensioned, and a Schedule 1 designer form. The City’s Part 9 submission page lists the supporting items too, such as an Energy Efficiency Design Summary, a mechanical design report, truss and joist layouts, and excavation or shoring design where it applies.

The drawings themselves usually include:

Drawing What it shows Why the city wants it
Site plan Building position relative to property lines, zoning summary, entrances, well and septic if present Confirms setbacks and zoning compliance
Grading plan Drainage and lot levels. Ottawa requires it for all rural lots and for new residential buildings or additions with a footprint over 55 square metres Keeps water away from neighbours and foundations
Foundation plan Foundation type, footing sizes, helical pile layout, soil gas protection Confirms the structure is carried safely
Floor plans Every storey, room uses, dimensions, openings Checks exits, room sizes and layout
Elevations All sides of the building Confirms height, windows and finishes
Cross sections and wall sections Footing depth, stair construction, guards and handrails Checks assemblies and stair safety

The details above come from the same Ottawa page. Larger and more complex buildings carry more: the City’s requirements for small, large and complex buildings add a Building Code Matrix, a Part 11 analysis for existing buildings, a geotechnical report and structural drawings showing live, dead, snow, wind and earthquake loads. If you own a commercial property, this is the tier you are in.

Smaller projects need less

Not every project needs the full set. Kenora’s chart shows the principle clearly: a single-unit dwelling needs a site plan, foundation or basement plan, complete floor plan, cross section, elevations and HVAC design, while porches and decks need only a site plan, foundation or basement plan and a partial floor plan. Ottawa sets its own list by project type, so confirm yours on the City’s page before drawing anything.

Drawing requirements compared for homes and decks

Interior renovations are lighter again. The Capital Regional District’s guide, for example, asks for existing and proposed floor plans plus construction details for an interior renovation, with new and existing construction clearly differentiated. That “existing versus new” habit is useful anywhere, and it matters even more in an older home, as the abatement section below explains.

For project-specific guidance, see our pieces on decks and permits in Ottawa, what a deck permit requires, bathroom permits and basement egress windows.

Permit drawings vs construction drawings

The two terms overlap, which is why people confuse them. A permit set is built to satisfy a reviewer. A construction set is built to satisfy the people doing the work.

Permit drawings Construction drawings
Main reader Plans examiner at the city Contractor, trades, suppliers
Purpose Prove code and zoning compliance Show exactly how to build
Typical content Site plan, floor plans, elevations, sections, required engineering Everything in the permit set plus finer dimensions, material and finish choices, and installation details
Detail level Enough for the review Enough to price and build without guessing

The line is not always sharp. Many municipalities require construction-level information in the permit set. Mississauga’s by-law, for instance, requires plans with sufficient detail to construct from, drawn to scale, legible, dated and marked “issued for construction”. In Ottawa, treat the submitted set as the document your inspector will hold you to. Anything you later change on site, such as moving a wall, resizing a window or relocating a plumbing stack, may need to be reflected in revised drawings.

The practical consequence: a bare permit set may get you approval, but it may not carry enough information to compare quotes. Quotes built on thin drawings leave room for assumptions, and assumptions become change orders. We write line-by-line, itemized quotes so you can see what each part of the job costs.

Who can prepare permit drawings

In Ontario, drawings for most building permits must come from a qualified person. The City of Peterborough states that the owner may prepare the drawings, but if the owner does not, they must be designed by a qualified designer with at least BCIN House qualification, an architect or an engineer, with a Schedule 1 form completed. A BCIN is the Building Code Identification Number given to designers who have passed the provincial qualification exams.

The homeowner exemption has limits. The Guelph permit guide lists the cases where a qualified designer is not required: renovations to an owner’s house with no more than two dwellings, a deck serving the owner’s house, and an accessory building of up to 50 m² (538 ft²). The exemption excludes HVAC design. The same guide explains that homeowners leave the BCIN section of Schedule 1 blank or tick the owner-exemption box. Ottawa’s page adds that a homeowner cannot take the design responsibility where a building has more than two dwelling units.

Engineered elements are separate. Trent Lakes notes that elements outside Part 9, such as LVL beams and ridge beams, need engineering, and Peterborough says engineered drawings must be stamped and signed. If your plan removes a load-bearing wall, you are in this territory.

For non-residential and multi-residential properties, the bar is higher. Mississauga requires drawings for these buildings to be signed, sealed and dated by an architect, professional engineer or qualified designer. Property managers and commercial owners should budget for design professionals from the start.

How to prepare drawings that pass review

Municipal rules differ on format, but the pattern is consistent. Check Ottawa’s current submission page for the exact standard, and use this routine.

  1. Start with the existing conditions. Measure the space and draw what is there now. Reviewers and contractors both need to see what stays, what goes and what is new.
  2. Fix the scope before you draw. Decide whether walls move, windows change or plumbing relocates. Each change adds sheets and sometimes engineering.
  3. Draw to scale and dimension everything. Ottawa requires scaled, fully dimensioned digital drawings. Oshawa’s by-law likewise requires plans that are legible, complete, fully dimensioned and to scale.
  4. Match the format to the portal. Submissions are digital in most Ontario cities. Brockville, for example, asks for individual PDF files named by document type, and Mississauga rejects secure or protected PDFs. Upload each sheet as its own clean file.
  5. Complete Schedule 1 honestly. It records who designed the project. Use the owner exemption only where it applies.
  6. Keep the approved set on site. Inspectors will want to see it during inspections, and the CRD guide requires a full approved hard-copy set to be kept on site.
  7. Expect screening. Some municipalities pre-screen applications, so an incomplete package is returned before review starts.

Code changes also move the requirements. Trent Lakes, for example, reports a 2026 change to its definition of a bedroom and has published information on Part 9 changes in the 2024 Ontario Building Code. Check the current code year with the building department before you finalize a design.

Older homes: abatement belongs in the drawings

This is where permit drawings meet our daily work. In an older Ottawa house, the walls you plan to open may contain asbestos-containing materials, vermiculite insulation may sit in the attic, and old paint may contain lead. Mould is also common after past water damage. None of this appears on a standard floor plan, yet it changes the order of work, the budget and the schedule.

What to do about it at the drawing stage:

  • Mark demolition on the existing-conditions sheet. A clear view of which walls, ceilings and floors come out lets us identify where hazardous materials are likely to be disturbed.
  • Test before you demo. Lab analysis is the way to know what is in a material. Our testing and lab analysis is listed at $300 to $600 CAD.
  • Sequence the trades. Abatement comes first, then demolition, then framing and finishes. Drawings that assume a clean start can fall behind if hazardous material turns up mid-job.
  • Keep the paperwork. We provide post-job documentation, and air quality testing is part of our service, which gives you a record to pair with the permit file.

Because we do abatement, demolition and renovation under one roof, the scope on the drawings and the scope on the quote can be set up together. Our published ranges give you a starting point: small Type 1 or 2 asbestos jobs run $1,500 to $3,500 CAD, and vermiculite attic removal runs $5,000 to $15,000 CAD. Whole-home or Type 3 work has no published price, because it depends on the property. Our abatement page explains the work in more detail.

Purely cosmetic work, such as interior and exterior painting, generally sits outside the drawing process. It tends to come at the end of a job, after the permitted work is inspected.

Older homes: abatement belongs in the drawings

What this means for different readers

Homeowners with an older house. Your drawings will probably need an existing-conditions sheet and a demolition scope. Test first, so the numbers you give a designer are real.

First-time renovators. Start with the City’s checklist for your project type. A bathroom or deck is far lighter than a basement finish or an addition. Our renovation permit application guide and building code compliance checklist cover the steps.

Property managers. Multi-unit buildings fall outside the homeowner exemption, so plan for a qualified designer and for engineered drawings. Make sure your contractor is licensed: see how to vet licensed renovation contractors in Ottawa.

Commercial owners. Expect the larger submission tier, with a Building Code Matrix and structural drawings. Compliance with safety regulations starts with the drawings and extends through abatement and demolition.

How we help

We handle permit management for our renovation and demolition projects, haul the debris and deliver post-job documentation. Our renovation ranges give you a sense of scale: bathroom renovations are listed at $15,000 to $35,000 CAD, kitchens at $25,000 to $75,000 CAD and basement finishing at $35,000 to $75,000 CAD. Full home renovations are listed at $100 to $250 CAD per square foot. Estimates are free and we aim to return them within 24 hours.

Hmjcontracting

See our renovation services or demolition services, or request an estimate through hmjcontracting.com.

Our perspective

Most permit delays we see in Ottawa trace back to one thing: the drawings were finished before anyone knew what was inside the walls. In a home with decades of history, that is a real risk.

Our view is that drawings, abatement and demolition should be planned as one job. When the existing conditions are tested and recorded first, the plans match the house, the quote matches the plans and the schedule holds.

That is why we put detail into every estimate, with line-by-line pricing, and why we keep abatement, demolition and renovation together. You get one team accountable for compliance from the first test to the final cleanup.

Jason

FAQ

What are permit drawings?

Permit drawings are scaled plans submitted with a building permit application. They show the site, floor layout, elevations, sections and structural information so the city can check the project against the Ontario Building Code and zoning rules.

Are permit drawings the same as construction drawings?

Not exactly. A permit set is prepared for the building department and shows what is needed to confirm compliance. A construction set adds the finer dimensions and installation details that trades build from. Some cities expect construction-level detail in the permit set, so ask your building department what applies.

Can I draw my own permit drawings in Ontario?

Often, yes, for your own house. Ontario municipalities such as Guelph and Peterborough describe an owner exemption for renovations to a house with no more than two dwellings, a deck serving the house and small accessory buildings. HVAC design and engineered elements are treated separately, and the exemption does not cover larger or multi-unit buildings.

Do I need permit drawings for a small renovation?

It depends on the work. A deck needs fewer sheets than a house, and an interior renovation can need only existing and proposed floor plans plus details. Ottawa’s submission pages list the requirements by project type, and we can confirm what your project needs when we prepare your estimate.

Does asbestos or mould affect my permit drawings?

It affects the work behind them. Hazardous materials are identified through testing, then removed before demolition and renovation, so your scope, schedule and budget change. Show the areas to be opened on the existing-conditions drawing so the abatement can be planned first.

Sources