Demolition Services
Safe & Clean Demolition
Interior and structural demolition in Ottawa with clean execution, clear timelines, and responsible debris removal.
Demolition that keeps your project on track
A good demolition job is controlled, clean, and predictable. HMJ removes what needs to go while protecting what stays so renovations can start without delays.
If there is any chance of hazardous materials (like asbestos) in an older property, we will help you handle it safely before demolition begins.
What to expect
- A quick walkthrough to confirm scope and access
- Protection of areas that stay (dust control and barriers)
- Controlled removal — not chaos — with safety-first habits
- Debris removal and a clean handoff for the next trade
What we demolish
Common demolition scopes we handle for Ottawa homes and commercial spaces.
Interior Demolition
Selective removal for renovations: walls, flooring, ceilings, kitchens, bathrooms, and commercial interiors.
Structural Removal
Safe removal of larger structures with planning, permits, and responsible disposal.
Debris Hauling
We remove and dispose of debris so your site is ready for the next phase.
Site Cleanup
Clean, organized work areas that reduce disruption and keep timelines moving.
Need a fast start?
Send your address and a few photos. We will reply within 24 hours with a clear plan and quote.
Why Choose HMJ for Demolition?
Safe and Certified
Licensed professionals following strict safety protocols.
Efficient Execution
Fast, clean demolition with minimal disruption.
Expert Planning
Strategic approach to maximize safety and minimize costs.
On Schedule
Clear timelines and regular progress updates.
Ready to get started? Call us today.
Free quotes · No obligation · Ottawa & surrounding areas
Ready to Clear the Way?
Get a free quote for your demolition project. We will respond within 24 hours.
Related Services From HMJ Contracting
Demolition is the starting point for most major renovation projects. Before demolition begins in any pre-1985 property, our asbestos and abatement team can survey and clear hazardous materials so the demo crew can work safely. Once the space is open, our renovation services build it back out, and our junk removal crew handles any remaining debris hauling for a clean handoff.
How We Run a Demolition Project
Good demolition is planned backwards from what stays. Here's the sequence we follow on every interior and selective demolition in Ottawa:
- 1
Site Assessment
We identify load-bearing elements, live services (electrical, plumbing, HVAC, gas), and any materials that need hazardous-material testing before disturbance — mandatory for pre-1990 buildings.
- 2
Utility Isolation & Protection
Services in the work zone are safely capped or rerouted. Floors, stairs, and finishes that remain are protected, and dust barriers with negative air keep the rest of the building clean.
- 3
Strip-Out
Finishes come out in controlled order — fixtures, millwork, flooring, then wall and ceiling surfaces — so recyclable materials stay separated and structural elements stay untouched.
- 4
Structural Removals (Where Specified)
Wall openings and beam installations follow engineered drawings, with temporary shoring in place until new structure is complete.
- 5
Broom-Clean Handoff
Debris hauled out, materials recycled where possible, site swept and ready for the next trade — with photos documenting conditions.
What Affects Demolition Cost
Demolition quotes vary widely because sites vary widely. These are the factors that set the price:
Access and floor level
A third-floor apartment strip-out with elevator restrictions takes longer than a ground-floor space with direct bin access.
Hazardous materials
If testing finds asbestos or mould, abatement happens first. Because we do both, you avoid the cost and delay of coordinating two contractors.
Disposal tonnage
Bin and tipping fees scale with weight — plaster and tile weigh far more than drywall and studs.
Selective vs. full strip-out
Working carefully around finishes that stay takes more labour than clearing a space to the studs.
Every project gets a free, written, no-obligation estimate — call 613-864-6333 or request a quote online.
Typical Demolition Cost Ranges in Ottawa
Demolition is priced by labour, access, and disposal weight. These are the ranges most Ottawa interior and selective demolition jobs fall into:
Single-Room Strip-Out
$1,000–$4,000One kitchen, bathroom, or bedroom taken back to the studs, with debris hauled away and the space left broom-clean.
Full Interior Strip-Out
$4,000–$15,000A whole floor or full home to the studs. Plaster-and-lath homes land higher than drywall because of disposal weight.
Garage or Shed Removal
$2,500–$7,500Detached structure teardown including slab-level cleanup and disposal. Concrete pad removal is quoted separately.
Structural Openings
$2,500–$10,000Load-bearing wall openings with engineered beam installs, temporary shoring, and City of Ottawa permits and inspections.
If hazardous-material testing comes back positive, abatement is quoted before demolition proceeds — with one contractor handling both, you skip the coordination delay and markup.
How Long Does Interior Demolition Take?
A single-room strip-out is usually done in 1–2 days. Full-floor or whole-home strip-outs typically run 3–7 working days depending on disposal logistics and access.
Structural removals add time for engineered drawings, permit review, and inspections — we flag those milestones in your estimate so the schedule holds no surprises.
Pre-1990 buildings need hazardous-material testing before demolition can start; lab results typically take a few business days, so booking testing early keeps your project on schedule.
Serving Ottawa & Surrounding Communities
HMJ Contracting provides demolition services across the entire Ottawa region, including:
- Kanata
- Orléans
- Barrhaven
- Nepean
- Gloucester
- Stittsville
- Manotick
- Westboro
- The Glebe
- Vanier
- Alta Vista
- Riverside South
- Findlay Creek
- Rockland
- Carleton Place
Don't see your community? If you're within about 50 km of Ottawa, give us a call — we likely cover you.
Frequently Asked Questions
Interior, non-structural strip-outs generally don't require a permit. Structural changes and full building demolitions do — and we handle those applications as part of the job.
Metals, clean wood, and cardboard are separated for recycling; the rest goes to licensed transfer stations. Disposal is included in your quote — no surprise bin charges.
Yes — selective demolition is most of what we do. We protect floors, stairs, and adjacent rooms, and remove only what's specified in the scope.
Small interior demolitions can often start within days. Larger projects depend on testing results and permit timelines, which we flag in your estimate.
Fully — liability insurance and WSIB coverage on every project, with certificates available on request before work begins.
Have a different question? Read our full FAQ or call 613-864-6333.